Mastbaum High School

This project involved the restoration of a 1930 era ceiling fixture mounted on the lobby ceiling.  There was no access to the fixture so it was un-maintained and fell into disrepair.  Although not particularly large or heavy, the design of the fixture required disassembly, piece-by-piece by the EC and we received boxes of parts.  Fortunately we had taken photographs for budgetary use several years before.

The fixture was re-structured inside so that it could be re-installed as two components.  Maintenance is still difficult (access only with scaffolding erected around a statue below) but less frequent due to the use of a Philips QL lamp.  Original finishes were duplicated, access door on bottom repaired and replacement glass side panels were slumped and installed.

 

 

 

louis vuitton outlet kate spade outlet cheap jordan shoes jordan 6 sport blue louis vuitton outlet louis vuitton outlet kate spade outlet louis vuitton outlet sport blue 6s cheap jordans coach factory outlet kate spade outlet kate spade outlet kate spade outlet kate spade outlet louis vuitton outlet foamposites for sale sport blue 3s lebron 12 louis vuitton outlet